Skip to main content

Design Development

Light weight accurate and nimble 3D views for enhanced coordination


  • Light weight accurate and nimble 3D views for enhanced coordination and team interaction at the pre-construction stage when the team is rapidly developing design and detailing.
  • A high degree of technical coordination is achieved both in pre-construction and during construction.
  • Every aspect of the work is located accurately and well-coordinated before it is built. Far less misunderstandings.
  • The entire team can develop the design with a much clearer understanding of systems integration.
M Moser In India