The entire schedule of a project can be linked to a visualisation of the step by step or week by week build that we call 4D.


  • By building virtually before building in reality all participants become more knowledgeable about how their work integrates.
  • The 4D sequence can be worked out and easily revised in pre-construction so that nothing is left to chance.
  • Our client can easily walk around the virtual construction to see how it would appear at any point in the schedule.
  • Our unique way of working with mockups and 4D sequences can pinpoint potential cost and time savings.